Home » References
![](https://onlinepresencead.com/ndeoffshore/wp-content/uploads/sites/8/2024/04/v-hilong106-300x200.jpg)
References
SAT Diving for Spool & Riser installation, Touchdown Monitering, As-Lay Inspection
Ocentra/Hilong 2023/2024 WORK DESCRIPTION: ROV Pipelay touch-down monitoring, SAT diving for Spool installation, Riser Clamp replacement, Riser installation and J-Tube installation, ROV as-lay inspection. Project
22 May 2024 No Comments
![](https://onlinepresencead.com/ndeoffshore/wp-content/uploads/sites/8/2024/05/astroaquilla-300x169.jpeg)
References
Pre-Con & Touchdown Survey
Ocentra/Hilong 2023/2024 WORK DESCRIPTION: Pre-construction Survey of Cable lay Corridor, Anchor clearance Survey, ROV touchdown monitoring & ROV Platform structure inspection. Project management, planning, and
22 May 2024 No Comments
![](https://onlinepresencead.com/ndeoffshore/wp-content/uploads/sites/8/2024/04/Vessel-w2w-300x169.jpg)
References
Helideck Installation
SIEMENS 2021 WORK DESCRIPTION: Fabrication & Installation of new helideck including Commissioning after installation: Project management and planning Engineering and Fabrication of helideck structure. Installation
18 April 2024 No Comments